Castle Hill Station - SuperTower™

The requirement for this project was unique and it was to install a SuperTower with stairs in the middle of the two tunnels. This type of installation was unusual, but we had the solution. We installed the SuperTower 30m free standing and then stabilised the SuperTower with two bridges at ground level to give access from the SuperTower to the base of the ground.

Each stair-box was lifted by a crane until we reached the 30m level and the two bridges at the top were connected.

The total erection time for this project was 8 hours with three men and a crane.

We achieved the above result with our good planning and careful delivery of each section to achieve this fast installation.