The $2b Barangaroo Development being constructed by Lend Lease.
Our SuperBridge is operating as a bridge.
11 bridges have been installed on site ranging from 20m to 35m in length.
Bridge rated at 4Kpa with a 10Kpa 6mm steel plate roof for protection.
Daily bridge movements is any where from 2000 workers per day (8000 movements per day).
One of the additional requirements for this project was to carry two concrete pipes from the concrete batching plant to the building site. The requirement was dead weight of 2500kg each pipe having a thrust load of 10kN/m per concrete pipe line on a bridge 20m long over traffic.
We turned to our design team to find a solution for the above requirement and our engineering team designed a SuperBridge to support the two concrete pipes as required by the builder including encasing the concrete pipes at the base of the bridge with two cubic metres of concrete to stop movement of the bridge due to the 10kN/m thrust in the concrete pipes.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vestibulum id nisi ac ipsum feugiat consequat. Nulla a odio metus. Nulla aliquam accumsan egestas. In lacinia, nibh at tempus luctus, dolor mi varius leo, eu malesuada tellus diam eget massa. Fusce a ipsum mi. Integer imperdiet nunc est. Praesent a luctus magna. Donec quis facilisis nisl, id sagittis magna.
Vivamus consequat felis eget mauris rutrum egestas. Praesent interdum mattis nulla, non dapibus tellus consectetur non. Sed facilisis augue quis elit malesuada commodo.