Just assemble our SuperAcess boxes together and there you have your SuperScaffold™. This innovation offers superior safety using non-slip decking, double handrails, kickboards on both sides and external mesh. It is ready to lift and ready to use saving you time and money on your job site.
BeaverTW will carefully assess your project and deliver the best possible solution by custom designing the layout of boxes to suit your job needs and deliver to you this revolutionary SuperScaffold™.
BeaverTW understands that time and productivity is critical on site, therefore we make our clients’ life easier by assembling the boxes at our premises and deliver them to your site, ready for use and installed in less than an hour. its fast, it’s safe and its a cost effective system replacing traditional scaffolding.
Length from 11.2m (24m²) to 22.4m (48m²) long sections can be lifted directly off the truck, into position and ready for use in one hour or less.
We can design a scaffold with NO TIES to the structure or building or we can design special ties and other tieing means to reduce the number of ties to the building.
Depending on height, condition and other factors, the SuperScaffold™ can be installed with NO TIES up to 30m high.
The SuperScaffold™ can be installed to full height of say 30m before the building is built. This will save our client time and money. No storage on site is required, clear access, no further labour may be required, the benefits and productivity gains to our clients are endless.SuperScaffold can incorporate loading platform, rubbish chute, ablution, toilet and amenity facilities on the scaffold.
To hire our SuperScaffold™, contact BeaverTW today on:
01743 811 813